    Kung ang magtatayo ng bahay ay design-and-build company, would you recommend na may separate architect na dapat i-hire as construction manager na hindi affiliated with that company for check and balance? Or waste of 6 to 10% fee lang dahil yung design and build company pwede na due to their in-house architects?

    Ano po ba experiences nyo dito?

    Salamat.

  2. Join Date
    Mar 2007
    Posts
    819
    #2
    Quote Originally Posted by draiman View Post
    Kung ang magtatayo ng bahay ay design-and-build company, would you recommend na may separate architect na dapat i-hire as construction manager na hindi affiliated with that company for check and balance? Or waste of 6 to 10% fee lang dahil yung design and build company pwede na due to their in-house architects?

    Ano po ba experiences nyo dito?

    Salamat.
    Kung kasama na sa contract to build yun then no need to hire an extra architect... unless you really want to. IMOHO

  3. Join Date
    Apr 2015
    Posts
    104
    #3
    Pwede ka naman mag hire ng sarili mong tao tapos maging basic function nya is Quality Control and Quality Assurance, kung tama ang pag kakaintindi ko pre determined na ang cost ng construction ng bahay per design sa mga ganyang company, so no need na for construction manager.

  4. Join Date
    Sep 2015
    Posts
    3
    #4
    ]Kung ang magtatayo ng bahay ay design-and-build company, would you recommend na may separate architect na dapat i-hire as construction manager na hindi affiliated with that company for check and balance? Or waste of 6 to 10% fee lang dahil yung design and build company pwede na due to their in-house architects?

    Ano po ba experiences nyo dito?

    Salamat.


    Yes you need to hire An Architect to check kung tama ba yung implementation nila sa plan and yung materials.. I think consultant Architect na lang ang kunin mo....

  5. Join Date
    Jan 2012
    Posts
    1,723
    #5
    Pwede ka mag design and build na contract then kumuha ka ng proj manager


    Sent from my iPhone using Tapatalk

  6. Join Date
    Nov 2005
    Posts
    7,976
    #6
    Normally meron na yan (PM) pero pwede rin naman mag hire ka ng separate.

  7. Join Date
    Oct 2015
    Posts
    300
    #7
    Thanks sa mga input.

    Kahit na may agreed price and materials with the company, some think na there should be an independent assessor.

    At this point I'm thinking, maybe once-a-week visit ng hired independent architect will do, instead na full-time hiring, kasi masyado mahal ang fee, 8 to 10 percent yata ng total contract price.

  8. Join Date
    Nov 2005
    Posts
    7,976
    #8
    Quote Originally Posted by draiman View Post
    Thanks sa mga input.

    Kahit na may agreed price and materials with the company, some think na there should be an independent assessor.

    At this point I'm thinking, maybe once-a-week visit ng hired independent architect will do, instead na full-time hiring, kasi masyado mahal ang fee, 8 to 10 percent yata ng total contract price.
    Totoo yan. I suggest build rapport sa mga gumagawa - esp. from the gen foreman to the skilled to the laborer dahil sila ang halos 24/7 na nasa project. Good luck.

  9. Join Date
    Oct 2015
    Posts
    300
    #9
    Hanap ka na ng kakilala mo na marunong magbasa ng plano, sya ang mag bantay sa site habang construction, tulad sa isang kamag anak, kinuha si father in law na civil Engr sa pag bantay ng site ng pamangkin, dami napapansin na di sinusunod ang plano lalo na sa bakal, sikat na contractor to dati na na bitag at sarado na yata ngayon, ang masakit nito kada accomplishment report na pinapadala sa bangko para sa pondo kulang compared sa actual accomplishment
    Quote Originally Posted by XTO View Post
    Totoo yan. I suggest build rapport sa mga gumagawa - esp. from the gen foreman to the skilled to the laborer dahil sila ang halos 24/7 na nasa project. Good luck.
    Eto problem mga sirs, 70+ na parents ko, mga utol ko may mga kanya kanyang trabaho at problema, mga kamaganak ko out of manila and unreliable, and I will be out of the country soon, kaya ang magiging basis ko eh ang monthly report na ipapadala sa akin. I guess, either I'll have to bite the bullet and hire a freelance architect/manager, or just go with whatever the design-build company says/reports to me, yun nga lang baka sub-standard ang materials at titipirin, which I won't have any control of dahil di ko nakikita, just like what happened sa first house ko na ang daming sablay at mali ang pagkaka pundasyon ng bahay.:nerves:

  10. Join Date
    Oct 2015
    Posts
    203
    #10
    Hanap ka na ng kakilala mo na marunong magbasa ng plano, sya ang mag bantay sa site habang construction, tulad sa isang kamag anak, kinuha si father in law na civil Engr sa pag bantay ng site ng pamangkin, dami napapansin na di sinusunod ang plano lalo na sa bakal, sikat na contractor to dati na na bitag at sarado na yata ngayon, ang masakit nito kada accomplishment report na pinapadala sa bangko para sa pondo kulang compared sa actual accomplishment

  11. Join Date
    Feb 2009
    Posts
    5,167
    #11
    Get a bonded and licensed contractor for your protection and pay by incremental progress on the project

  12. Join Date
    Mar 2013
    Posts
    6,160
    #12
    Yeah house construction is not something you take lightly. Mistakes can be expensive. Worse they can cover it up if you aren't there. Plans need to be changed and decisions made on the spot due to unforeseen events arising. Best if you think this thru

  13. Join Date
    Nov 2007
    Posts
    1,587
    #13
    Agree that you get a separate consultant architect to check the design and build company's work.
    Check mo rin previous works Nila Kung meron. Talk to the owners of previous projects para may real feedback ka.
    When you build your house, build it right the first time since sasakit ulo mo after a few years if not done right.
    Example Lang is a friend who spent close to 30M for his huge house in an exclusive village. After 5 years, bumaha from the roof. Ayun, dinaya sila ng contractor who placed small pipes as drainage. They had to spend 800k to fix those pipes which were embedded sa walls nila.

  14. Join Date
    May 2009
    Posts
    1,990
    #14
    ang isang matinding gawain e yung hinahabol lang sa palitada yung column o beam na nagkaroon ng void after curing ng concrete.

    imo, mas mainam pa rin na may counter-checking ng trabaho at materyales.

  15. Join Date
    Feb 2007
    Posts
    122
    #15
    Hirap magpagawa, pag wala ka contractor, sakit sa ulo ng mga workers, pati materyales Ikaw magaasikaso, ubos oras. Pag meron ka naman contractor, sakit din ng ulo, puro advance. Yung last project ko, ayun naubos pera ni contractor, ako nagtapos lahat.

  16. Join Date
    Mar 2013
    Posts
    6,160
    #16
    You will have to shoulder the VAT. In all cases the buyer shoulders the VAT

    Sent from my SM-G955F using Tapatalk

  17. Join Date
    Oct 2002
    Posts
    17,338
    #17
    Quote Originally Posted by EQAddict View Post
    You will have to shoulder the VAT. In all cases the buyer shoulders the VAT

    Sent from my SM-G955F using Tapatalk
    I second the emotion