Kung bayad naman ang plans at babayaran mo rin sya para maglakad, then there is no reason para mapasubo sa kanya.
He should be able to give a fixed quotation based on the plan and the specification sheet.
Sa architectural items madali kasi either supply mo nga or replace and deduct the cost stated on the itemized quotation.
But don't forget the specs of the other plans, like sa structural ung rebar plan and concrete mixture strength. Sa electrical, brand ng wire, outlets, switches and circuit breakers. For sanitary and plumbing, brand and thickness ng pipes.
Palagay ka na rin ng abang para sa CCTV at internet lines [emoji4]


Reply With Quote

