New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Results 1 to 15 of 15

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. Join Date
    Sep 2003
    Posts
    25,189
    #1


    MMDA
    Liked · 10 mins

    [Admin 05] ADVISORY: Upgrading, Repair and Rehabilitation of Espana Blvd. (P. Campa to N. Reyes Sts., Sampaloc Manila):

    STAGE 1 (May 15 to June 3, 2014):

    Quezon City bound along Espana = = Two (2) lanes open
    FEU bound = = Lane closed
    Center island to be opened to traffic for Quezon City bound vehicles

    Quiapo bound along Espana = = Two (2) lanes open
    N. Reyes St. Espana bound = = Lane closed

    SOUTH BOUND ALTERNATE ROUTES:

    > Vehicles from Espana Blvd. to FEU, left turn at A.H. Lacson, right S. H. Loyola, right R. Papa to destination
    > Vehicles from Espana Blvd. to Lawton, City Hall, Pier, left turn at A.H. Lacson, right J. Fajardo, left Earnshaw, right Legarda to destination
    > Vehicles from Espana Blvd. to Lawton, City Hall, Pier, left turn at A.H. Lacson, straight to Nagtahan Fly-over and Nagtahan Bridge, right Otis to destination
    > Vehicles from Espana Blvd. to Lawton, City Hall, Pier, right turn at A.H. Lacson, left Dapitan, left A. Mendoza, straight to Quezon Blvd. to destination

    NORTH BOUND ALTERNATE ROUTES:

    > Vehicles from Quiapo/Quezon Blvd., right turn at Lerma, straight to Espana to destination
    > Vehicles from Quiapo, take Quezon Blvd. service road, right C.M. Recto Avenue, left N. Reyes, right R. Papa, left S.H. Loyola, left P. Noval, right Espana to destination
    > Vehicles from Quiapo/Quezon Blvd., straight ahead to C.M. Recto underpass, straight to A. Mendoza, right Laon-laan, right A.H. Lacson to destination

  2. Join Date
    Oct 2002
    Posts
    40,599
    #2
    Pasok na mga rebels without a cause at birahin niyo na ulit itong project...


    Sent from my iPad using Tsikot Car Forums

    #retzing

  3. Join Date
    Oct 2003
    Posts
    2,973
    #3
    nauna na ako! hehe dito ako nakatira sa area na ito eh! hehehe

    as usual, isasabay ng DPWH ang rehabilitation na ito sa pasukan. sana nung march sinimulan na nila para bago mag-june tapos na siya. kung wala pa ngang ginagawa ngayon, traffic na, what more kung may pasok na? kudos to DPWH.

  4. Join Date
    Oct 2002
    Posts
    40,599
    #4
    Quote Originally Posted by zechs View Post
    nauna na ako! hehe dito ako nakatira sa area na ito eh! hehehe

    as usual, isasabay ng DPWH ang rehabilitation na ito sa pasukan. sana nung march sinimulan na nila para bago mag-june tapos na siya. kung wala pa ngang ginagawa ngayon, traffic na, what more kung may pasok na? kudos to DPWH.
    Hinde pa ba naurong pasukan?


    Sent from my iPad using Tsikot Car Forums

    #retzing

  5. Join Date
    Sep 2005
    Posts
    15,310
    #5
    July pasok sa UST.

  6. Join Date
    Sep 2013
    Posts
    505
    #6
    Quote Originally Posted by zechs View Post
    nauna na ako! hehe dito ako nakatira sa area na ito eh! hehehe

    as usual, isasabay ng DPWH ang rehabilitation na ito sa pasukan. sana nung march sinimulan na nila para bago mag-june tapos na siya. kung wala pa ngang ginagawa ngayon, traffic na, what more kung may pasok na? kudos to DPWH.
    medyo alangan kasi yung approval of funds for big projects like this one kaya natataon lagi sa tag-ulan/school season. sana taasan nila yung kalsada, same height ng across UST ng espaŅa blvd. and hopefully maayos yung drainage sa ilalim ng overpass dyan. anlalim eh.

    may di maka-move on sa kabilang thread. hehehe

  7. Join Date
    Sep 2003
    Posts
    21,384
    #7
    24/7 pala project na yan for 2 months.

    hirap matulog nyan yung mga residents along espana, sa ingay ng mga heavy equipts.

    Posted via Tsikot Mobile App

  8. Join Date
    May 2014
    Posts
    49
    #8
    Oh yes road project! Aayos na rin kalsada wooot

  9. Join Date
    Feb 2008
    Posts
    9,431
    #9
    ok yan. sana lang may mga naka bantay na enforcers parati para hindi mag traffic.

    kawawa lang mga nakatira near the area. siguradong maalikabok yan hehe

  10. Join Date
    May 2005
    Posts
    6,090
    #10
    This morning before 8AM the traffic has spilled onto the Quezon Blvd underpass already.

  11. Join Date
    Oct 2003
    Posts
    2,973
    #11
    sa tingin nyo before july tapos na ito? possible, but highly doubt it.

  12. Join Date
    Nov 2013
    Posts
    621
    #12
    13 July daw ang TCD


    Sent from my 3310 using Tsikot Forums

  13. Join Date
    Nov 2009
    Posts
    3,522
    #13
    Portion lang yata ng Espana ang aayusin from P Campa to Morayta. Ang Espana AFAIK ay itinaas na.

    Hindi ba dapat sa P.Paredes ang right turn dahil one way palabas ang R.Papa?

    Drainage dapat ayusin dyan bago itaas kalsada.

  14. Join Date
    Nov 2007
    Posts
    1,407
    #14
    Kung tataasan lang ang kalye mukhang di pa din masosolusyonan ang pagbaha diyan sa lugar, mas mataas ang kaye sa mga establishments, kung bumaha lagot na ang mga nakapuwesto doon.

  15. Join Date
    Sep 2005
    Posts
    15,310
    #15
    tinaas ang espana eh di ang tubig don lang ang punta sa mga side streets..

Tags for this Thread

Espana Rehabilitation May-July 2014