    #61
    Quote Originally Posted by oj88 View Post
    After all the hullabaloo, the press briefings and all the traffic congestion mitigation schemes, the Prez just decided to throw a monkey wrench on the whole thing.

    But TBH, I can't blame him. From the get-go, everything was going too fast. The official announcement for the EDSA rehab project only came out in May, and then it was scheduled to begin in less than a month? I've worked on projects that are magnitudes smaller and less complex, yet, it had more elaborate planning and preparation.

    And their knee-jerk reaction was evident. Yun lang odd-even, among other congestion mitigation schemes, everyday since the announcement nagbabago yung parameters at ang daming clarifications. It's quite apparent that they're thinking about it as they go along.

    I don't claim to be an expert, but at least for a project this big.... 12 months in advance ang notice. Alternate routes are being established. Schedules of when and which segments of EDSA will be worked on. Areas where the odd-even scheme will be implementet (since EDSA will be worked on in segments), etc. Just broad strokes of how things should've been done.
    I agree. Take the Guadalupe Bridge rehabilitation. That was announced at least a year before it was to be implemented.

  2. Join Date
    Mar 2014
    Posts
    2,374
    #62
    'Leadership'?

    Anyway, hindi talaga papaiwan ang pinas kung palabuan lang pagdating sa mga ganyang klaseng plano o balakin.

  3. Join Date
    Oct 2002
    Posts
    40,557
    #63
    Kawawa yun mga contractors. Yun preparation and mobilization nila for a project this big. Yun mga advance orders ng materials baka nag pirma na ng leases for heavy machineries. Yun mga expedited na hiring ng tao. Ewan ko dapat ituloy na yan.

    There's not way around it, traffic talaga habang ginagawa. The more they delay lalong hinde nanaman magagawa.

    Mukhang tama nga si dutiti, weak leader


    Sent from my iPhone using Tapatalk

  4. Join Date
    Jul 2013
    Posts
    6,603
    #64
    Quote Originally Posted by shadow View Post
    I don't agree sa postponement, this looks bad on the leadership
    agree. not a fan of delaying the repair... or finding a solution to make the project faster.

    do it the proper way once and problem na ng susunod na generation yung next rehabilitation.

  5. Join Date
    Jul 2013
    Posts
    6,603
    #65
    Quote Originally Posted by shadow View Post
    Kawawa yun mga contractors.
    naisip ko lang over the weekend... sino kaya contractor nitong EDSA Rehab project???

  6. Join Date
    Mar 2014
    Posts
    2,374
    #66
    Quote Originally Posted by ice15 View Post
    agree. not a fan of delaying the repair... or finding a solution to make the project faster.

    do it the proper way once and problem na ng susunod na generation yung next rehabilitation.
    Yung pondong inilaan para diyan, sana hindi kangkungin...

  7. Join Date
    Jan 2009
    Posts
    6,261
    #67
    Quote Originally Posted by shadow View Post
    Kawawa yun mga contractors. Yun preparation and mobilization nila for a project this big. Yun mga advance orders ng materials baka nag pirma na ng leases for heavy machineries. Yun mga expedited na hiring ng tao. Ewan ko dapat ituloy na yan.

    There's not way around it, traffic talaga habang ginagawa. The more they delay lalong hinde nanaman magagawa.

    Mukhang tama nga si dutiti, weak leader
    Tingin ko matutuloy yan. The timing is ripe para maging 'legacy' ni Prez before his term ends.

    Wala eh, they are all playing improv.... no script, no coordination, just playing for the Likes.

  8. Join Date
    Apr 2005
    Posts
    2,888
    #68
    1 month lang naman yung hold. I also felt too short yung notice. So baka by January gawin na yan. Baka hindi rin ready pa ang mga gagawa.

  9. Join Date
    Nov 2002
    Posts
    1,998
    #69
    Quote Originally Posted by ice15 View Post
    agree. not a fan of delaying the repair... or finding a solution to make the project faster.

    do it the proper way once and problem na ng susunod na generation yung next rehabilitation.
    Just like the Rehab of Boracay.
    A lot of people hated it, loss of jobs , etc, etc, etc.
    Look at it now compared to before the rehabilitation.

    Quote Originally Posted by ice15 View Post
    naisip ko lang over the weekend... sino kaya contractor nitong EDSA Rehab project???
    Multiple contractors according to the grapevine. Not just one. it meant to speed up its construction.

  10. Join Date
    Oct 2010
    Posts
    2,520
    #70
    Yang rehab pamera lang yan
    Wala ngang pinapakita na conceptual outcome ng rehab.