Results 41 to 50 of 85
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 54,261
May 28th, 2025 02:35 PM #41
-
May 31st, 2025 02:06 PM #42
-
Tsikot Member Rank 2
- Join Date
- Jan 2007
- Posts
- 2,624
May 31st, 2025 03:16 PM #43Quotes from the article...
Since the project is for “public good,” he said this should “always prevail over private rights.”
Sounds rather communist
Other measures already in place include removing x-ray machines from train stations and replacing them with K-9 units to shorten queues and improve the flow of passengers.
They should remove those weighing stations for trucks that you see along roads like Marcos Highway. Those cause such a big disruption to the flow of traffic.
-
May 31st, 2025 03:17 PM #44
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 54,261
May 31st, 2025 08:14 PM #45
-
May 31st, 2025 08:39 PM #46
Exactly my question. Why does it have to be done all at the same time? They were already doing reblocking on weekends on certain segments on a schedule previously. Why can't they do that again instead of this great inconvenience. And it seems to be a last minute idea to rehabilitate which leaves them scampering for band-aid solutions to the traffic mess about to unfold.
-
-
May 31st, 2025 09:59 PM #48
-
May 31st, 2025 11:00 PM #49
-
May 31st, 2025 11:15 PM #50
Yikes that(tesla) is even worse although upon some additional reading i'm not even sure our Seagull...
BYD Seagull