hi guys, probably all of us in one way or another have used NLEX whether on the way to work or to our homes. the traffic, as in any roads undergoing a rehabilitation is inevitable.

but wait a minute, as i have observed these past few days, the traffic is getting worser and worser. as early as 5 A.M. the traffic is already piling up both ways, be it north or south bound (especially on the Tullahan Bridge) and stretches to the Malinta Exit, sometimes beyond that. And the traffic swells every minute.

the absence of warning devices, is the major cause, aside from the vehicle volume and the unscrupulous driver. even if there are such devices, it is placed too near the construction site, preventing the motorists to anticipate the road situation creating a choke point...

sana naman, yang mga l....k na cotractors at PNCC na yan mahalata na ito ang problema, nakakagalit e.