1. Kaingin Rd up to the intersection with Multinational Avenue is extremely heavy traffic because the (C5 South) highway's 3 lanes is reduced to just 1 lane with lots of potholes and parked vehicles in front of Allegro and a squatter's (?) area beside the NAIA. Complicate this with tricycles and motorcycles doing their counterflow (4th lane) and its a carmageddon to say the least. So it does not provide fast and easy access for those living in Las Pinas, Cavite and to some in Paranaque. When is this road going to be widened and fixed??? [Only those in Merville, Moonwalk and villages in Bicutan benefit from this flyover]
2. The flyover project is short sighted [again] as it does not provide link to Skyway North and Skyway South.... So two major thoroughfares - C5 and Skyway are still not connected!!!
Since I do not want to pass through Kaingin - because of the heavy traffic there,- I still use NAIAX. However, since there is no link to Skyway North,- then I still have to pass through Sales Br and Resorts World.... [I am still part of the traffic problem there]....