    Hello mga fellow tsikoters,

    does anybody know anyone from the building department of city hall ng imus cavite?

    my scenario here is, done with fire clearance, done with zoning clearance now sa building department po kami naiipit..

    where building a 2 story house and they require us to have a structural analysis and we did, now the problem here is that may sinasabi yung city engr ng imus na yung structural analysis and sa structural plan namin ay hinde pareho raw yung footing schedule..not sure kung ano hinde parehas..

    ano poba ang gagawin kopo dun aside from offering na pampadulas?

    i already spend 40k sa pag process nitong permit pero hinde padin tapos..hope some one can help me out.

    TIA!

  2. Join Date
    Oct 2011
    Posts
    26,781
    #2
    Sir, you might opt to ask the structural designer regarding footing design based on the result on soil analysis. Binayaran mo rin naman ung structural designer for the structural plan submittted. Correct mo muna un and samahan mo ng padulas.

  3. Join Date
    Nov 2010
    Posts
    236
    #3
    sa palagay ko di parehas ang dimensions/designs/specification ng footing sa SA atsa SP...better check it kung ok naman lahat ng papers mo bakit ka pa magsusuhol though mas mabilis nga lang ang may pampadulas...

    usually kung sino gumawa ng plan siya rin ang gagawa ng SA better balik ka dun sa gumawa then pa review mo...

  4. Join Date
    Oct 2002
    Posts
    21,422
    #4
    Ipakausap mo engineer mo dun sa city engineer.
    Signature

  5. Join Date
    Jul 2006
    Posts
    8,555
    #5
    Tsk, yan ang ayaw ko dyan sa city hall/munisipyo ng imus ... puro kwarta ang nasa ulo ng mga empleyado!

    I'll ask my wife kung nasa kanya pa yung mobile number nung engineer na gumawa ng plans ng bahay namin. That guy knows people inside city hall. PM ko sayo.

    IIRC, footing schedule is the size of the footing (width x lenght) and the thickness of the steel bars x the number of steel bars.
    Last edited by lowslowbenz; October 10th, 2012 at 11:35 AM.

  6. Join Date
    Aug 2006
    Posts
    383
    #6
    Thank you all and thank you lowslowbenz...sana mahanap niyo po yung number ng engr po