New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 39 of 39 FirstFirst ... 293536373839
Results 381 to 389 of 389
  1. Join Date
    Jun 2005
    Posts
    3,767
    #381
    Quote Originally Posted by CVT View Post
    I need to check my IATF pass tuloy...

    LPC - N/A nakalagay

    So, LPC to any point in the Philippines?
    Yup. Sakin nga sobrang useless. Makati - Makati lang

    Sent from my MI MAX 2 using Tapatalk

  2. Join Date
    May 2006
    Posts
    4,127
    #382
    Quote Originally Posted by absinthe View Post
    RP is now valid and honored nationwide. Pero wala pa akong nadadaanan na checkpoints with scanners in Laguna / Batangas. Siguro just in case lang (pero wag na sana please).

    ---

    BTT: With TPLEX 99.999999999999% completed already (kulang nalang yung Sison Exit which will open real soon), sana bilisan ng NEDA yung approval for Phase 2 aka SJ extension.
    alam ko meron ng ginagawa na road segments within this SJ ext.
    mas mabilis na ang biyahe ko hanggang Bauang, LU pag na-realized ito!

  3. Join Date
    Feb 2018
    Posts
    1,334
    #383
    Quote Originally Posted by sirkosero View Post
    Depends. Nakaindicate dyan kung ano ang home location mo at office location. Kaya sa rapidpass application, pinapasulat ang farthest entry. Meron ako kilala from batangas to NCR nakalagay.

    Sa kuya ko naman naka sulat N/A to N/A kasi anywhere within the country sya. Government eh.

    Sent from my MI MAX 2 using Tapatalk
    sakin baguio-limay/mandaluyong nakalagay pero never na-honor sa biyahe. mas effective pa yung iatf id ko haha

  4. Join Date
    Sep 2007
    Posts
    928
    #384
    Quote Originally Posted by Gumusut_Amige View Post
    alam ko meron ng ginagawa na road segments within this SJ ext.
    mas mabilis na ang biyahe ko hanggang Bauang, LU pag na-realized ito!
    Boss baka yung sinasabi mo ay yung Bauang - San Fernando - San Juan Bypass Road which is currently U/C c/o DPWH.

  5. Join Date
    May 2006
    Posts
    4,127
    #385
    Quote Originally Posted by absinthe View Post
    Boss baka yung sinasabi mo ay yung Bauang - San Fernando - San Juan Bypass Road which is currently U/C c/o DPWH.
    so iba pala yon... bro, saan ba ang daan nitong rosario-san juan LU expressway?

  6. Join Date
    Sep 2007
    Posts
    928
    #386
    ^^ "general alignment" here [which is sure to change once actual ROW acquisition starts]

    Note: Phase II will not start at Rosario rotunda / terminus


  7. Join Date
    Dec 2005
    Posts
    39,162
    #387
    Quote Originally Posted by absinthe View Post
    ^^ "general alignment" here [which is sure to change once actual ROW acquisition starts]

    Note: Phase II will not start at Rosario rotunda / terminus

    Thanks for sharing bro.

    Wow! So TPLEX is up to Rosario na (?).

    Looking forward to Phase 2!

  8. Join Date
    May 2006
    Posts
    4,127
    #388
    Quote Originally Posted by absinthe View Post
    ^^ "general alignment" here [which is sure to change once actual ROW acquisition starts]

    Note: Phase II will not start at Rosario rotunda / terminus

    thanks bro, so bale parang hindi na pala dadaan ng Agoo.
    magtatagal lang siguro sa mga bridge construction ng Aringay at Bauang!

    sana kakayanin tapusin hanggang 2022 nga.

  9. Join Date
    Sep 2007
    Posts
    928
    #389
    ^^ Meron ng OPS ang SMC pero bagal ng NEDA-IC eh kainis, dadaan pa to sa NEDA Board for final approval, mag Swissmiss Challenge pa ito IIRC, etc...haist.

    Pero nevertheless eh nagstart na apparently ang DPWH na mga anciallary surveying sa potential ROW going to SJ.

    To CVT: Yes Sir, TPLEx main carriageway is 100% completed and is operational now until Rosario terminus going to

    • Left: MacArthur HWay to La Union / Ilocos
    • Right: Baguio via Kennon Road
    • Top: Pugo / Baguio via Marcos HWay or Asin Rd
    • Bottom: TPLEx




    ===


    DPWH constructed a rotunda which will eventually be a flyover in yeaaars' time once traffic demand warrants one [meron na daw nagawang study DPWH, the rotunda will suffice...for now].



    ===

    Sison Exit will open next month, targeted August 15. Once this happens, TPLEx Phase 1 is 100.00% fully completed.



    Photos c/o PinoyJoyride
    Last edited by absinthe; July 25th, 2020 at 12:53 PM.

Page 39 of 39 FirstFirst ... 293536373839
Tarlac-Pangasinan-La Union Expressway (TPLEx) [Merged]