New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 33 of 61 FirstFirst ... 2329303132333435363743 ... LastLast
Results 321 to 330 of 607
  1. Join Date
    Oct 2002
    Posts
    40,095
    #321
    Dapat paggamit na nila yun temporary ramp for southbound.


    Sent from my iPhone using Tapatalk

  2. Join Date
    Sep 2008
    Posts
    295
    #322
    Quote Originally Posted by shadow View Post
    Ano sinasabi mo? Anong walang nangyari? Nawala yun traffic nun binuksan na yun isang lane. Nag sorry siya ulit now dahil isasara naman yun isang lane ng South bound. [emoji19]


    Sent from my iPhone using Tapatalk
    My daily travel from the south has normalized after opening the temporary ramp. There are times it was even faster than prior to the start of all these works.

    We can only hope this next phase in the construction doesn’t last too long.


    Sent from my iPhone using Tapatalk

  3. Join Date
    Mar 2009
    Posts
    823
    #323
    Quote Originally Posted by BratPAQ View Post
    Grabe, ang daming bus na exit yang alabang, 3 terminals dyan sa alabang. I just can't imagine all of them being re-routed to filinvest exit. Eh ang filinvest exit pa naman eh 2 toll gated lang, and 1 of them is ETC. Compared to alabang exit na 6 toll gates, 2 for skyway and 4 for slex.

    Sent from my Mi 9T Pro using Tapatalk
    those buses or class 2 and 3 will be re routed to exit susana heights... pero you're still correct.

    at present traffic na parati sa susana exit, then traffic pa mismo sa susana (going to the national road/highway), imagine people from muntinlupa would bear this crappy burden for how long?

    worst is filinvest exit, imagine all class 1 vehicles would be re routed there, even if they ad 100 ambulant tellers it wont do any good, since the crossroad after filinvest exit is a choke point, specially at night where commuters going to laguna use the exit.

    I live in the area, hence the statement.

  4. Join Date
    Jul 2009
    Posts
    10,280
    #324
    Quote Originally Posted by victorevolution View Post
    those buses or class 2 and 3 will be re routed to exit susana heights... pero you're still correct.

    at present traffic na parati sa susana exit, then traffic pa mismo sa susana (going to the national road/highway), imagine people from muntinlupa would bear this crappy burden for how long?

    worst is filinvest exit, imagine all class 1 vehicles would be re routed there, even if they ad 100 ambulant tellers it wont do any good, since the crossroad after filinvest exit is a choke point, specially at night where commuters going to laguna use the exit.

    I live in the area, hence the statement.
    How will that work? From Susana to alabang terminals? Via Manila South Road in Muntinlupa? Or exit and enter Susana again and exit at alabang exit NB? Which ever of the 2 that will add at least 30 minutes to the trip, and maybe up to an hour on a Friday rush hour.

    Sent from my Mi 9T Pro using Tapatalk
    Last edited by BratPAQ; January 23rd, 2020 at 01:12 PM.

  5. Join Date
    Oct 2002
    Posts
    40,095
    #325
    Sabi naman doon sa statement 6 weeks lang gagawin unlike nun sa NB dahil ito sabay na closed pati isang lane service road.

    Everninf rush hour dapat pagamit na nila yunbl temporary ramp Pa SB.

    Para lahat ng going further south doon sa temporary ramp ang exit. Pero dapat lagyan nila ng barricade hangang pagbaba ng alabang bridge para hinde doon dumaan yun mga mag exit dapat ng filinvest.
    Sent from my iPhone using Tapatalk
    Last edited by shadow; January 23rd, 2020 at 01:35 PM.

  6. Join Date
    Sep 2007
    Posts
    928
    #326
    ^^ Designed lang ata yung steel ramps for C1? Pero tama na lagyan ng traffic cones hanggang dun sa Alabang off-ramp para iwas swerving going to Filinvest.

    If steel ramps ay indeed C1 only, dapat eh meh mga nakamando dun sa steel ramp o maglagay ng signage na steel ramps ay for C1 lang. Kung C2 naman, dapat coordinated din ng SOMCO sa Muntinlupa LGU / PNP / Barangay / Filinvest na padaanin nalang lahat ng C2 from South Station derecho Filinvest Exit na para dina sa ilalim ng Alabang viaduct daan.

    SOMCO has already included SLEx signage at the signage going down Hillsborough off-ramp, image c/o TGP:



    ---

    One more thing pala: hindi pa tapos ang kalbaryo sa NB. Meron pang approximately 5-8 (?) columns yet to be piled bored sa Uratex on-ramp. Kita sa on-ramp yung pier markings.

    Quote Originally Posted by shadow View Post
    Dapat paggamit na nila yun temporary ramp for southbound.


    Sent from my iPhone using Tapatalk
    Pag evening rush hour nakikita ko na steel ramps ay for SB traffic, though I've yet to see bi-directional traffic at the same time.

    Based sa pic ni SOMCO (not sure if bago ito), inalis na nila yung traffic cones sa median lane...I think starting Feb 16 traffic flow will be:

    1 lane NB strictly for RFID vehicles muna (which includes South Station) (stop-go traffic for those coming from the viaduct / SouthStation)
    2 lanes will be for SB:
    - evening rush hour: stop-go traffic for those using the steel ramps (C1)
    - C2 will use SouthStation

    (matraffic na magulo pero tiis tiis ng six weeks)
    Last edited by absinthe; January 24th, 2020 at 08:50 AM.

  7. Join Date
    Sep 2007
    Posts
    928
    #327
    Yun palang "SLEx" na signage ay swivel type - so pag SB ang direction ng steel ramps ilalabas nila yan. Pag NB naman ay nakatago sa likod (saw it kanina when I was going NB using the ramps.

    Speaking of ramps, inayos na ng SOMCO yung approach ng steel ramps (mabuti naman).

  8. Join Date
    Sep 2015
    Posts
    13,919
    #328
    pag click ko sa thread na ito eh nakakastress.

    wala ba balita na positive sa south.

  9. Join Date
    Mar 2008
    Posts
    52,731
    #329
    Quote Originally Posted by kagalingan View Post
    pag click ko sa thread na ito eh nakakastress.

    wala ba balita na positive sa south.
    starbucks mugs from cebu.
    "south".
    heh heh.

  10. Join Date
    Sep 2007
    Posts
    928
    #330
    Traffic advisory for the impending Feb 16 doom

    from SOMCO Twitter page:






Tags for this Thread

SLEX Alabang traffic