Dapat bigyang pansin ng SMC yung skyway entry sa makalampas ng Susana Heights northbound, nagkukulumpulan ang mga sasakyan na nagpupumilit maka pasok sa entry ng skyway na nag ko-cause ng gridlock all the way from San Pedro Laguna at buong MCX all the way from MCX tollgate. Lagyan dapat ng delineator barriers kung di ma disiplina ang mga motorista, pag lampas naman ng skyway entry napakaluwag naman sa ilalim na SLEX northbound. It defeats the purpose of this skyway if you got stuck in traffic for hours during rush hour just to enter the start of the skyway.
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 52,517
June 21st, 2021 09:38 PM #532
-
Verified Tsikot Member
- Join Date
- Apr 2013
- Posts
- 142
June 22nd, 2021 10:04 AM #533
-
June 22nd, 2021 12:00 PM #534
-
June 22nd, 2021 12:57 PM #535
Bossing sa obserbasyon ko ginagawa naman nila yung sinasabi mo na nag bibigayan kaso you cannot do that in speed in excess of 25 kph so dahil you cannot seamlessly do a bigayan in 80 kph or else bangaan yan or pile up, in the end gridlock or tail end long enough na nadefeat yung purpose ng expressway. Here in Dubai merging traffic is assigned in a different section of carriageway where there will be no exit or entry so that cars can seamlesly merge or exit by using delineator fixed barriers so dapat malayo pa lang alam mo na ang iyong pupuntahan at naka line up ka na sa intended mong lane.
-
Verified Tsikot Member
- Join Date
- Apr 2013
- Posts
- 142
June 22nd, 2021 03:36 PM #536Tama, imposible ang seamless merging dyan kasi yung nasa SLEX mainline, assuming 80-100kph ang takbo, then papasok yung galing MCX, 40-60kph lang sila since galing sila sa curved section. The acceleration lane from MCX tunnel is not enough to speed up to 80-100, so they will try to merge left *60kph tops, hence domino effect na sa mainline.
Napansin ko sakit din ito ng maraming driver upon entering the expressway (not necessarily from MCX), kahit 40kph pa lang sila they try to merge early.
Akala nila design lang ang acceleration lane, it's there for a reason, step on the gas and match the speed of those on the main lanes before merging!
-
Tsikot Member Rank 2
- Join Date
- Jan 2008
- Posts
- 4,726
June 22nd, 2021 03:55 PM #537
-
June 22nd, 2021 04:40 PM #538
-
July 1st, 2021 11:22 PM #539
Maayos yung issue ng merging pag nagawa na yung expansion ng overpass bridge [no movement yet here] + additional lanes [this is ongoing].
-
Tsikot Member Rank 2
- Join Date
- Jan 2008
- Posts
- 4,726
July 23rd, 2021 11:04 AM #540lubog na naman SLEX san pedro kagabi... dyan sa tapat ng alaska.. wala na ginawang flood control dyan ang SLEX management, parang pinabayaan kagabi... hayy
Kwento ng katrabaho ko, meron daw sya officemate dati na Italiano na tinanong daw bakit...
Traffic!