April 12th, 2021 01:39 AM #521
-
April 12th, 2021 05:08 PM #522
As of 3:27pm today, steel ramp was still used for NB traffic [one lane].
So siguro pwede pading bi-directional traffic hanggang dipa tapos yung NB [streetlights, drainage].
-
April 14th, 2021 04:27 PM #523
San Miguel says to hasten construction of Skyway Extension southbound | ABS-CBN News
Sarado na daw sa April 19 exit ng Hillsborough
Sent from my iPhone using Tapatalk
-
April 15th, 2021 12:41 PM #524
^^ Possible ganito ang set-up:
Closed muna temporarily ang Skyway South Station NB on-ramp - C1 vehicles coming from LP / Ayala Alabang going NB can take Filinvest on ramp tapos keep left for steel ramp [ingat nalang sa pag merge lanes para iwas disgrasya].
3 lanes yung Hillsborough to Alabang viaduct / steel ramp diba, so based kay SMC [this is facing South]:
- leftmost lane: vehicles as stated above going NB using 1 lane steel ramp
- median lane: SB vehicles bound for SLEx using 1 lane steel ramp
- rightmost lane: SB vehicles bound for Alabang [existing South Station area]
---
Parang ang layo na kasi mashado kung via MCx ang u-turn...pero para seamless traffic na nga kahit hassle at mapapalayo dagdag toll / gas expenses pa, ito pinakabest gawin :D :D :D
-
April 17th, 2021 03:58 AM #525
Hmm, 2-lane steel ramp will be for SB traffic only per TGP
So...mali ang aking hunch
Skyway Alabang steel ramp will be exclusive to southbound motorists starting April 19
-
April 17th, 2021 07:52 AM #526
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 52,731
April 21st, 2021 08:08 PM #527nag-surface level ako.
sayang 40+ pesos difference kung mag skyway.
wala namang traffic sa baba, e.
-
April 21st, 2021 08:35 PM #528
-
April 22nd, 2021 02:53 AM #529
Looks like the existing 3 lanes from Sucat T/P until the temporary steel ramps got a fresh asphalt overlay + eagle cement powder mix + solid lane markings [diba naka angat yung median lane gawa inalis yung dating concrete barriers] [bollards have been removed as well]
PJ
-
May 3rd, 2021 12:31 PM #530
SB update - Hillsborough off-ramp currently being demolished [thank you for your service but as one of the main causes of insane traffic jams especially pre-covid rush hour, you will not be missed]
The northbound of skyway extension project was opened last April 2021. What remains is the southbound portion. Let us check as we reach the month of May 2021, how was the progress. You could see geofoams used on the exit ramps of the skyway extension sb. The Hillsborough off-ramp is now closed to traffic as it will be removed to connect the extension project.
Choice I would have made as well.:nod: