    Quote Originally Posted by dr. d View Post
    i wonder,
    what will happen if the car keeps on the leftmost lane like before?
    is that old entrance to skyway gonna still be there?
    Steel ramp will be used for SB traffic going SLEx bound as SOMCO will demolish existing Hillsborough off-ramp.

  2. Join Date
    Sep 2007
    Posts
    928
    #522
    Quote Originally Posted by dr. d View Post
    i wonder,
    what will happen if the car keeps on the leftmost lane like before?
    is that old entrance to skyway gonna still be there?
    As of 3:27pm today, steel ramp was still used for NB traffic [one lane].

    So siguro pwede pading bi-directional traffic hanggang dipa tapos yung NB [streetlights, drainage].

  3. Join Date
    Oct 2002
    Posts
    40,068
    #523
    San Miguel says to hasten construction of Skyway Extension southbound | ABS-CBN News

    Sarado na daw sa April 19 exit ng Hillsborough


    Sent from my iPhone using Tapatalk

  4. Join Date
    Sep 2007
    Posts
    928
    #524
    ^^ Possible ganito ang set-up:

    Closed muna temporarily ang Skyway South Station NB on-ramp - C1 vehicles coming from LP / Ayala Alabang going NB can take Filinvest on ramp tapos keep left for steel ramp [ingat nalang sa pag merge lanes para iwas disgrasya].

    3 lanes yung Hillsborough to Alabang viaduct / steel ramp diba, so based kay SMC [this is facing South]:

    • leftmost lane: vehicles as stated above going NB using 1 lane steel ramp
    • median lane: SB vehicles bound for SLEx using 1 lane steel ramp
    • rightmost lane: SB vehicles bound for Alabang [existing South Station area]


    ---

    Parang ang layo na kasi mashado kung via MCx ang u-turn...pero para seamless traffic na nga kahit hassle at mapapalayo dagdag toll / gas expenses pa, ito pinakabest gawin :D :D :D

  5. Join Date
    Sep 2007
    Posts
    928
    #525
    Quote Originally Posted by absinthe View Post
    ^^ Possible ganito ang set-up:
    Hmm, 2-lane steel ramp will be for SB traffic only per TGP

    So...mali ang aking hunch

    Skyway Alabang steel ramp will be exclusive to southbound motorists starting April 19

  6. Join Date
    Mar 2014
    Posts
    5,975
    #526
    Quote Originally Posted by absinthe View Post
    Hmm, 2-lane steel ramp will be for SB traffic only per TGP

    So...mali ang aking hunch

    Skyway Alabang steel ramp will be exclusive to southbound motorists starting April 19
    Reasonable, IMHO with the closure of the Hillsbor ramp & the opening of the NB ramp. That HB ramp is a bottleneck.


    Sent from my iPad using Tapatalk

  7. Join Date
    Mar 2008
    Posts
    52,701
    #527
    nag-surface level ako.
    sayang 40+ pesos difference kung mag skyway.
    wala namang traffic sa baba, e.

  8. Join Date
    Jan 2006
    Posts
    12,608
    #528
    Quote Originally Posted by dr. d View Post
    nag-surface level ako.
    sayang 40+ pesos difference kung mag skyway.
    wala namang traffic sa baba, e.
    I rarely use the Skyway from Sucat to Nichols. The same lang naman travel time kung at grade or upper level. Tipid pa ako sa baba.


    Sent from my iPhone using Tapatalk

  9. Join Date
    Sep 2007
    Posts
    928
    #529
    Looks like the existing 3 lanes from Sucat T/P until the temporary steel ramps got a fresh asphalt overlay + eagle cement powder mix + solid lane markings [diba naka angat yung median lane gawa inalis yung dating concrete barriers] [bollards have been removed as well]







    PJ

  10. Join Date
    Sep 2007
    Posts
    928
    #530
    SB update - Hillsborough off-ramp currently being demolished [thank you for your service but as one of the main causes of insane traffic jams especially pre-covid rush hour, you will not be missed]



    The northbound of skyway extension project was opened last April 2021. What remains is the southbound portion. Let us check as we reach the month of May 2021, how was the progress. You could see geofoams used on the exit ramps of the skyway extension sb. The Hillsborough off-ramp is now closed to traffic as it will be removed to connect the extension project.