Results 511 to 520 of 607
-
March 27th, 2021 08:48 PM #511
-
April 1st, 2021 05:44 PM #512
Lipat dito from SS3 thread
Kung babalikan natin yung renders ng SMC, they are planning to place 3 T/Ps there, pero I think highly likely magbago pa ito, baka at most 2 nalang since gagawin narin naman purely ETC [Autosweep] Skyway et al diba:
===
Speaking of S2E NB, mukang this April na to...irerepurpose kaya muna nila ynug 2-3 toll booths sa Main Sucat T/P para makakolekta ng toll pending construction ng S2E T/Ps? Abangan...
Pinoy Joyride
Skyway extension as of yesterday afternoon.
There are new signs placed along slex informing motorists to keep right when using skyway extension as it is for rfid users and class 1. There are lane markings painted and based on the picture you can see how many lanes. Mukhang malapit na buksan.
SMC's favorite solid line lane markings in place - 3 NB diet lanes
-
April 11th, 2021 01:34 PM #513
Per the SPW, S2E NB is scheduled to be soft-opened today [any time now]. This needs to be massively disseminated in trad / soc med para hindi magkalituhan bukas [quarantine status notwithstanding].
Sneak peek first person drive-through video here
Lodi RSA with the SPW on their final inspection earlier:
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 52,698
-
Verified Tsikot Member
- Join Date
- Mar 2008
- Posts
- 483
April 11th, 2021 02:51 PM #515
-
April 11th, 2021 03:48 PM #516
Pag hinde nila extend yun outer lane hanggang doon sa pag labas ng MCX, parang walang maitutulong masyado malapit sa Alabang bridge yun entry. Dapat ayusin na nila para malayo pa lang andoon na lahat sa right lane mga gagamit niyang
Sent from my iPhone using Tapatalk
-
April 11th, 2021 03:51 PM #517
-
April 11th, 2021 03:53 PM #518
-
April 11th, 2021 11:46 PM #519
S2E in 360 degrees by PJ
(This video will not work on TV not unless it has 360 capability)
The video started from Susana Heights Exit towards Alabang Toll Plaza Skyway Northbound.
The Northbound of the Metro Manila Skyway (Skyway Extension Project) was officially opened to the motorist today 04.11.2021 at exactly 4pm as announced both by DPWH and SMC Infrastructure. This extension will serve as the new entry to Skyway road network coming from the south, the old ramp was removed. This project can accommodate three lanes. Approximately around 3km, after Susana Heights exit and MCX entry, drive to right most lane in preparation of entry to the Skyway Extension. Please be reminded only ETC / Autosweep RFID and Class 1 vehicles allowed entry.
You can rotate the screen to see the nearby views of this structure.
Finally this project is complete! Keep safe and take care!
While waiting for bridge overpass expansion, once nakalagpas ng MCx on-ramp...KEEP RIGHT na po
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 52,698
April 12th, 2021 12:51 AM #520i wonder,
what will happen if the car keeps on the leftmost lane like before?
is that old entrance to skyway gonna still be there?
Denali Lights, Dial Dim, & Soundbomb Review—Is It Worth The Premium? | Behind A Desk MotoDeal
Auxiliary Driving|Fog Lamps