October 16th, 2019 10:26 AM #433Based on the news article, Sumitomo signed off na pwede siyang gamitin... but....
Maintenance of Dalian Trains were outside of their original contract since hindi kasama sa original scope of work nila. Supposedly/Apparently magkakaruon ng change or addition to include them once the track rehab is complete.
Mahirap lang magsalita ngayon na hindi pa tapos track rehab pero here is hoping na after ma rehab lahat, balik sa minimum 60kph takbo, magamit na sana talaga yung mga Dalian trains na binili since andiyan na yan. wala na tayong magagawa kahit anu pa gusto natin (whatever side of the fence we are on).
Kung may kelangan kasuhan, kasuhan sila, pero dapat magamit pa din kasi alangan naman itambak lang yan sa depot para mabulok lang din.
-
October 16th, 2019 11:05 AM #434
wrong context ata bro. hindi applicable daw iyan kasi wala pa iyong riles ng lrt 1 cavite line.
iyang cavite lrt extension kasi iyong pinangalingan na sagasa issue na iyan kasi napako na pangako. wala daw nag bid for this ppp project i assume kasi hindi profitable para sa mga interesado or sadyang maliit ang kickbackLast edited by baludoy; October 16th, 2019 at 11:17 AM.
-
September 17th, 2020 06:07 PM #435
MRT-3 levels up, deploys record-high 21 trains | Inquirer
MRT-3 said the 21 fielded train sets is a record-high.
-
-
January 25th, 2021 08:47 AM #437
These train units look familiar.
When Adobe Stopped Flash Content From Running It Also Stopped A Chinese Railroad
-
December 17th, 2021 10:27 AM #438
Duterte unveils MRT-7 train sets, calls rail system 'world-class' | Manila Bulletin
-
BANNED BANNED BANNED
- Join Date
- Sep 2015
- Posts
- 13,919
December 18th, 2021 12:48 AM #439^
nagcoconsider ako sa farview because of this. Im at ease driving papunta jan dire-direcho lang. Pabalik from zabarte to timog nakuha ko 15minutes. Masarap magdrive wala gaano liko at konti stoplight.
-
May 25th, 2022 11:27 AM #440
Sabado ng May 14, pauwi na ako galing work.. Ibinaba ko yung katrabaho ko sa Rosario, Pasig lagpas lang ng kaunti sa footbridge.. Hinarang ako ng dalawang MMDA, kinabahan ako akala ko bawal magbaba dun.. Ayun pala tatanungin lang ako kung willing ako sumagot ng survey.. Nabiro ko tuloy sila kuya dahil sa kaba ko..
Then may isang babae na may tablet ang lumapit, survey pala sa MRT4.. After nung survey, ako naman yung nagtanong kung approved na at ano yung mga stations kung kasama ba ang Taytay, Rizal.. Approved na daw yung MRT4, yung stations hindi pa final ang kaya nya lang ma-confirm na meron sa Pasig.. Ilang weeks na daw sila nagsu-survey sa area..
Sana nga, tuloy-tuloy na yung project.. Pero katakot-takot na namang traffic kapag sinimulan na naman ang construction..
as an aside, in the olden days, anyone who does not move 'ala luksa during Holy Week, especially...
Traffic!