New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 36 of 48 FirstFirst ... 2632333435363738394046 ... LastLast
Results 351 to 360 of 471
  1. Join Date
    Dec 2009
    Posts
    3,006
    #351
    ^electronics on the train coaches need to match the system installed on the rails and the stations as well

    what are currently installed is outdated and needs to be upgraded

    only then can they refit the dalian coaches with electronics that match the upgraded signalling system

    Sent from my ASUS Chromebook C202SA using Tapatalk

  2. Join Date
    Jan 2003
    Posts
    2,407
    #352
    Quote Originally Posted by dr. d View Post
    matagal pa siguro.
    as i understand it, the bagones did not come with the requisite electronics, to communicate with the rest of the train system.

    everytime i think about it, my blood boils at those responsible.
    during the time of purchase, they were singing praises, that our woes will soon be over.
    Doc, i think everything is part of the contract so everyrhing will be in order. They are just making a big hullabaloo here. My wild guess is that everything that was done for show is actually part of the contract.

  3. Join Date
    Mar 2008
    Posts
    52,700
    #353
    i just heard on the radio, that there are four dali-an trains already in service.
    i hope more will be available na sunud-sunod.

    this is one time where i am happy to have been mistaken.

  4. Join Date
    Oct 2006
    Posts
    5,684
    #354
    Quote Originally Posted by dr. d View Post
    i just heard on the radio, that there are four dali-an trains already in service.
    i hope more will be available na sunud-sunod.

    this is one time where i am happy to have been mistaken.
    But according to radio reports they will only be fielded during off-peak hours?

    Sent from my Mi A1 using Tapatalk

  5. Join Date
    Mar 2014
    Posts
    686
    #355
    ^Being cautious probably.

    Sent from my SM-N960F using Tapatalk

  6. Join Date
    Aug 2006
    Posts
    315
    #356
    Manageable naman pala talaga simula pa nung una pinatagal pa. Halatang pinulitika lang. Weight issues ang pambato nila dati. Yung mga Dutertard nagpapalusot sinasabi ginawan daw ng paraan ni Tatay Digong para magamit. Di ba ipipinipilit nilang isauli pa nga yung mga tren?

    DOTr says issues hounding Dalian trains 'manageable' to begin with | Money | GMA News Online

  7. Join Date
    Mar 2006
    Posts
    17,575
    #357
    ^ si Grace poe din ang numero unong tirador niyan ng kampanya. I wonder kung nag issue na sya ng statement since tadtad ng comments iyong Twitter acct niya....kasama na ako dun MRT Thread

    do what you gotta do so you can do what you wanna do
    Last edited by baludoy; October 29th, 2018 at 05:03 PM.

  8. Join Date
    Apr 2011
    Posts
    588
    #358
    Quote Originally Posted by baludoy View Post
    ^ si Grace poe din ang numero unong tirador niyan ng kampanya. I wonder kung nag issue na sya ng statement since tadtad ng comments iyong Twitter acct niya....kasama na ako dun MRT Thread

    do what you gotta do so you can do what you wanna do
    also with the media failon, noli et al.

    hahaha tahimik sila ngayon. failon ngayon

  9. Join Date
    Aug 2012
    Posts
    455
    #359
    nasan na yun report nung 3rd party. nailabas na ba?

  10. Join Date
    Mar 2008
    Posts
    52,700
    #360
    i hope we do not find out in the near future.
    if it is overweight, as originally alluded to, the rails will wear out fast.

Tags for this Thread

MRT Thread