New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 2 of 2 FirstFirst 12
Results 11 to 17 of 17
  1. Join Date
    Jan 2011
    Posts
    1,646
    #11
    balitaan ko lang din kayo mga katsikot my plan nga din gumawa ng batangas-mindoro superbridge via isla verde
    pangarap lang muna pero kahit panu my mga politician nagpapanukala nyan mga future superbridge sa visayas kahit in 20 yrs sana my magawa...

  2. Join Date
    Nov 2005
    Posts
    45,927
    #12
    welcome to the Republic of Press Release

  3. Join Date
    Jun 2009
    Posts
    325
    #13
    Quote Originally Posted by uls View Post
    welcome to the Republic of Press Release
    Maging totoo sana ang kanilang mga plano. Huwag na sana idaan sa PPP, lalong di matutuloy ang project sa dami ng review. At least kung foreign funded thru ODA, mas malapit sa katotohanan. Kung PPP yan, taong bayan din magbabayad niyan thru high toll fees once completed.

  4. Join Date
    Jun 2007
    Posts
    995
    #14
    Quote Originally Posted by lowslowbenz View Post
    The nearest points would be Sibulan town (Negros Oriental side) and Santander/Lilo-an (Cebu side).. Both points at present already have a ferry service.

    3.3 km distance to cross Tanon straight by bridge, possible....... compared to Guimaras-Bacolod link
    Last edited by shakatak70; August 19th, 2012 at 06:00 PM.

  5. Join Date
    Jan 2011
    Posts
    1,646
    #15
    Quote Originally Posted by shakatak70 View Post
    3.3 km distance to cross Tanon straight by bridge, possible....... compared to Guimaras-Bacolod link
    yun lang 500 meters deep daw jan sa tanin straight...icoconsider din yun dept..
    pwede din sibulan, negros oriental to santander, cebu yun link na bridge or tunnel
    malapit yun sa dumaguete city

  6. Join Date
    Oct 2002
    Posts
    2,716
    #16
    kilo-kilometrong bridges?

    eh yung 50-meter bridge na tumawid lang maliit na ilog, antagal gawin ng dpwh eh ... isang taon na hindi pa tapos!

    pero masipag ngayon ang dpwh magtapal ng aspalto sa mga lubak, yun nga lang mukhang madali rin mabakbak sa susunod na ulan

    gudlak na lang sa mga tongressman

  7. Join Date
    Jan 2011
    Posts
    1,646
    #17
    Quote Originally Posted by kinyo View Post
    kilo-kilometrong bridges?

    eh yung 50-meter bridge na tumawid lang maliit na ilog, antagal gawin ng dpwh eh ... isang taon na hindi pa tapos!

    pero masipag ngayon ang dpwh magtapal ng aspalto sa mga lubak, yun nga lang mukhang madali rin mabakbak sa susunod na ulan gudlak na lang sa mga tongressman
    well ika nga future project lang naman naniniwala parin ako magagawa yan mga after 50yrs siguro

Page 2 of 2 FirstFirst 12

Tags for this Thread

Bridges linking Panay, Guimaras and Negros